Cutting machine for cooling machine is there any requirement?
by:ZORON Machinery2021-01-29
In recent years, the popular ZuoLong mechanical cutting machine, so in order to let you better understand the cutting machine, so I collect the following article on the cooling machine maintenance.
timely replacement of cooling water, cooling water with pure water, conductivity requirements: 30 us/cm<
Conductivity & lt;
50us/cm。
If the conductivity is greater than 50 us/cm, need to change in time of cooling water;
If conductivity is less than 30 us/cm, but the cooling water and tap water, add water to pay attention to the monitoring of conductivity value, avoid conductivity above requirements.
chassis adopted closed design.
Keep in the middle of the use case closed state, in order to prevent external high temperature and high humidity of air into the chassis.
To examine the case closure should pay attention to the following aspects:
1, synfuels fiasco cupboard door is shut.
At the top of the lifting bolts are tight;
Case back unused communication control interface protection cover whether the cover is good, have been used are fixed;
Whether the power cord access seal, etc.
2. If for some reason in the process of using the cupboard door need to open the case, you need to shut off the cold water machine, then to boot.
Wait until you can close the cabinet door, please follow the boot sequence, turn on the power switch device after running more than 60 minutes, to open the cold water machine, cold water machine such as high and low actual temperature reaches set temperature range of + / - 1 ℃ warm water after high pressure apparatus.