'' welding machine maintenance and maintenance in winter

by:ZORON Machinery     2021-01-29
These days all over the country a large cooling, since the weather turns cool, that '' welding machine maintenance and maintenance in winter what to notice? Today ZuoLong mechanical small make up to you a simple introduction.





1, the equipment of the external

because this machine is main part of the optical components, equipment keep its surface should be clean, please install the equipment in the indoor dust or dirt fewer of them, keep the equipment external environment health, focus on cleaning the following parts:

painted light path dustproof cover

u clean cooling water tank at the top of the

taken the case into the wind net

u clean protection lens at least once a day, such as too much stain please replace the new protection lenses.

2, refrigeration equipment maintenance and maintenance

u please ensure tank filled with water before starting the

u 30 days to change a tank of water, on a regular basis to ensure the condensing cavity ceramic core, light and clean. In order to ensure the cooling effect of device, cooling equipment, please refill the distilled water, the worst for purified water

7 days taken regularly clean once in front of the water tank filter dust

to end the replacement of filter element, found yellow or black to replace in a timely manner, to ensure that after cavity of the water clean. Change the time for 2 months.

warm prompt: if the equipment need not when for a long time, cooling water should be doing.

3, xenon lamp replacement

u xenon lamp as a common light source device, usually by people also called xenon lamp, pulse xenon lamp. Xenon lamp is a kind of filling xenon photocell or flashing lights. Xenon chemical inertness, not burning, combustion. Is the natural gases in large molecular weight, high density. Xenon gas pressure from strong ultraviolet radiation lamp, can be used in medical, spectrometer spectral and various kinds of industrial equipment. Painted

xenon lamp is one of the machine use consumables, due to the long time use device, xenon lamp energy will be reduced, if the parameter debugging in a - 160 180 a, or cannot be good welding of product, please replace the new xenon lamp.

u normal xenon lamp life in more than 1 million times or time about 6 months need to change.

in wen xin:

painted during the winter, the working environment temperature shall not be lower than 0 ℃; Otherwise, easy to cause cavity glass tube burst in the body.

to end in the winter cold water machine and cooling fluid is prohibited.

u when working environment temperature is less than 3 ℃, shall timely circulate in the water or add alcohol ( Including the water in the water pipes, use air gun to blow the net) , otherwise easy to cause the cavity body glass tube, etc.

u can wrapped a layer of frost cotton on pipe, also can effectively prevent frostbite.

painted on the cold water machine can add in a suitable amount of hot water at low temperature ( Prohibit direct heat to fast) Painted

the machine do not free disassembly, encounter major fault shall timely notify the company technical support.

is ZuoLong mechanical small make up of the content above, the hope can help you!