2656284142@qq.com

English

Winter use maintenance method

by:ZORON Machinery     2021-01-29
Marking equipment in daily use process should pay attention to some matters, we are in the cold winter weather, pay more attention to some details can prevent damage of machine parts and prolong the service life of equipment. Here are some basic daily maintenance methods ( For reference only) :





1, in any case, before open the light and sound power, make sure the acousto-optic device fully cooled, otherwise will burn out acousto-optic device. Must pay attention to the boot order marking equipment, shutdown order also should pay attention to, not careless oh.

2, marking equipment enclosure must be reliable grounding, otherwise may cause the damage of the part precision vibration lens, and is likely to cause YAG rods and damage.

3, in order to prevent the dust into the light path, computer and power caused by static electricity, dust of the necessary measures should be taken to, try not to place the marking equipment in tuyere, intersections and easy to blow into the dust.

4, marking, surface after gasification gas rise, part of the condensation on the surface is at the top of the mirror. Use after a period of time, will affect the light, usually every few months, check to see if a mirror on the presence of spray type translucent oil dirties.

5, under no condition, it is forbidden to random arouse reflection frames, otherwise may cause can't output. Unless the punch press, such as the source by the side of the marking equipment, otherwise light path does not need to reset, so don't worry about such faults and problems.

6, there is a neglected area is cold water machine. Cold water machine, due to different cooling conditions in summer and winter respectively to set the cyclic temperature value in 25 degrees and 28 degrees, and to reduce scale formation of circulating water, purified water should be used, and the use of frequency change water every 1 to 2 months time, filter cleaning once every six months, the filter every 1 - 2 years. And pay attention to the water water cooling machine, less than two-thirds of the time full of water to add water. And pay attention to the water quality change, replacement of cooling water on a regular basis.

7, pay attention to the computer don't infected with the virus, should be taken before using U disk to usb antivirus. Write down some parameter values at ordinary times, even when the infection to reinstall the software, you can fill in each parameter values, ensure the quality of marking is not affected.

8, there are many electric circuit part marking equipment, don't in the marking equipment placed in the rain.

9, must be strictly leakage on both ends of the connecting pipe, otherwise there will be no refrigeration cooling system.

10, error of sequence of operation will lead to not work properly.

we want more cutting machine price, welcome to inquire, hotline:
Custom message
Chat Online 编辑模式下无法使用
Leave Your Message inputting...